The South Building, which contains most of the amenities, is now up to Level Five. The 5th level concrete slab was just poured. The next steps include structural walls and posts, then framing for the roof and construction of the rooftop pool deck on Level 6. The North Building is at Level Three. Concrete pillars … Read More